• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

LA Sports Today

Los Angeles Sports News continuously updated

  • Football
    • Chargers
    • Rams
    • Wildcats
  • Baseball
    • Angels
    • Dodgers
  • Basketball
    • Clippers
    • Lakers
    • Sparks
  • Hockey
    • Ducks
    • Kings
  • Soccer
    • Angel City FC
    • Galaxy
    • Galaxy 2
    • LA FC
    • Orange County FC
  • College
    • UCLA
    • USC

Evan Phillips, Michael Kopech Behind Schedule

February 12, 2025 by MLB Trade Rumors

Dodgers right-hander Evan Phillips missed the World Series last year due to shoulder troubles, but the full scope of his injury was never made clear until camp opened this week. Phillips tells the Dodgers beat that he was diagnosed with a small tear of a tendon in his rotator cuff during the 2024 postseason (link via Bill Plunkett of the Orange County Register). The tear was not significant enough for doctors to recommend surgery, but Phillips received a cortisone injection and was shelved while his teammates closed out the postseason with a World Series win over the Yankees.

Even with the lack of surgery, Phillips could be IL-bound to begin the season, Plunkett writes. A follow-up MRI in December revealed significant healing but still some damage. Phillips has been limited in his offseason throwing program but said yesterday that he hopes to be on a mound “soon.”

The 30-year-old Phillips is a key member of the Dodgers’ late-inning relief corps when healthy. He picked up 18 saves in 2024 and another 24 saves the year prior. During his three full seasons as a Dodger, the former Braves, Orioles and Rays castoff has posted a 2.21 ERA with a big 29.6% strikeout rate against a tidy 6.5% walk rate. Phillips has saved 44 games overall and also been credited with 34 holds. He’s earning $6.1MM this year in his penultimate season of club control before reaching free agency in the 2026-27 offseason.

There’s a similarly murky update on fellow late-inning righty Michael Kopech. The Dodgers quickly moved to downplay a report that their deadline bullpen acquisition from last summer would miss a month to begin the season. GM Brandon Gomes at the time said that the team hadn’t seen “anything of concern yet” with regard to Kopech’s reportedly ailing forearm. To be fair to the team, there’s still no firm indication Kopech will be out a month, but manager Dave Roberts today conceded that Kopech, like Phillips, is “a little behind schedule” and is not a lock to be on the Opening Day roster (via The Athletic’s Fabian Ardaya).

Like Phillips, Kopech played a key role in the Dodger bullpen after struggling with another organization. He posted a lackluster 4.73 ERA with the White Sox despite a huge 30.9% strikeout rate. Command was an issue with the South Siders, evidenced by a 12.6% walk rate, but a pitcher with Kopech’s raw stuff and former prospect pedigree seemed like he should fare better than he was with the ChiSox.

His fortunes indeed turned almost immediately after the trade. Kopech posted a microscopic 1.13 earned run average in 24 innings with Los Angeles. His 33% strikeout rate was a slight improvement, as was his 11.4% walk rate, but that walk rate was still about three percentage points higher than average. Kopech enjoyed a significant uptick in his opponents’ swinging-strike rate and chase rate, however, which adds some legitimacy to the improvement. He’s not going to sustain the ridiculous .167 average on balls in play or 91% strand rate he enjoyed with the Dodgers, but Kopech’s power arsenal and bat-missing abilities should make him a key arm for Roberts in the right-hander’s final season before free agency — assuming this forearm issue indeed proves minor.

The Dodgers, of course, made several meaningful splashes in the bullpen this winter, which will help to offset any missed time for Phillips and Kopech. In addition to re-signing Blake Treinen on a two-year deal, they gave out the largest contract for any reliever this winter when signing Tanner Scott on a four-year, $72MM deal. That pair will be joined by right-hander Kirby Yates, who inked a one-year, $13MM pact.

Filed Under: Dodgers

Primary Sidebar

Recent Posts

  • Dodgers are routed by Athletics but will get Clayton Kershaw back Saturday
  • Jacob Wilson makes himself at home as A’s crush Dodgers
  • Angel City defender Savy King, who collapsed during game, has heart surgery
  • Angels blow late lead in walk-off loss to Fernando Tatis Jr., Padres
  • Lugo proves he’s steady in a pinch with second HR off the bench

Categories

Archives

Our Partners

All Sports

  • 247 Sports
  • Bleacher Report
  • LA Sports Hub
  • Los Angeles Daily News
  • Los Angeles Times
  • Los Angeles Sports Nation
  • Orange County Register
  • OurSports Central
  • The Sports Daily
  • The Sports Fan Journal
  • The Spun
  • USA Today

Baseball

  • MLB.com - Dodgers
  • MLB.com - Angels
  • Dodger Blue
  • Dodger Insider
  • Dodgers Nation
  • Dodgers Way
  • Halo Hangout
  • Halos Heaven
  • Last Word On Baseball - Angels
  • Last Word On Baseball - Dodgers
  • MLB Trade Rumors - Angels
  • MLB Trade Rumors - Dodgers
  • Think Blue LA
  • Think Blue PC
  • True Blue LA

Basketball

  • NBA.com - Clippers
  • NBA.com - Lakers
  • Amico Hoops - Clippers
  • Amico Hoops - Lakers
  • 213 Hoops
  • Clipperholics
  • Clips Nation
  • Forum Blue And Gold
  • High Post Hoops
  • Hoops Hype - Clippers
  • Hoops Hype - Lakers
  • Hoops Rumors - Clippers
  • Hoops Rumors - Lakers
  • Lake Show Life
  • Lakers Nation
  • Lakers Outsiders
  • Lakerholics.net
  • Last Word On Pro Basketball - Clippers
  • Last Word On Pro Basketball - Lakers
  • Pro Basketball Talk - Clippers
  • Pro Basketball Talk - Lakers
  • Real GM - Clippers
  • Real GM - Lakers
  • Silver Screen And Roll

Football

  • Los Angeles Chargers
  • Los Angeles Rams
  • Bolt Beat
  • Bolts From The Blue
  • Chargers Gab
  • Chargers Wire
  • Last Word On Pro Football - Chargers
  • Last Word On Pro Football - Rams
  • NFL Trade Rumors - Chargers
  • NFL Trade Rumors - Rams
  • Our Turf Football - Chargers
  • Our Turf Football - Rams
  • Pro Football Focus - Chargers
  • Pro Football Focus - Rams
  • Pro Football Rumors - Chargers
  • Pro Football Rumors - Rams
  • Pro Football Talk - Chargers
  • Pro Football Talk - Rams
  • Ramblin Fan
  • Rams Gab
  • Rams Nation
  • Rams Wire
  • Turf Show Times

Hockey

  • Anaheim Calling
  • Elite Prospects - Ducks
  • Elite Prospects - Kings
  • Jewels From The Crown
  • Last Word On Hockey - Ducks
  • Last Word On Hockey - Kings
  • My NHL Trade Rumors - Anaheim Ducks
  • My NHL Trade Rumors - LA Kings
  • Pro Hockey Rumors - Ducks
  • Pro Hockey Rumors - Kings
  • Pro Hockey Talk - Ducks
  • Pro Hockey Talk - Kings
  • Pucks Of A Feather
  • Rink Royalty
  • The Hockey Writers - Ducks
  • The Hockey Writers - Kings

Soccer

  • Angels On Parade
  • LAG Confidential
  • Last Word On Soccer - LA Galaxy
  • Last Word On Soccer - Los Angeles FC
  • MLS Multiplex

College

  • Bruins Nation
  • Busting Brackets
  • College Football News
  • College Sports Madness
  • Conquest Chronicles
  • Go Joe Bruin
  • Last Word On College Football - UCLA
  • Last Word On College Football - USC
  • Reign Of Troy
  • Saturday Blitz
  • Zags Blog

Copyright © 2025 · Magazine Pro on Genesis Framework · WordPress · Log in